QUESTION 116
A regional insurance claims processor runs SAP HANA for daily operational reporting. After a scheduled workload increase, SAP HANA cockpit shows higher memory usage and slower report response times. The alert list shows a threshold warning, but the operations note only records that reports are “slow.” A support analyst proposes increasing the threshold so the warning no longer appears.
The constraint is that the administrator must determine whether the warning represents a real workload pattern requiring follow-up or only an alert configuration mismatch. The response must preserve monitoring usefulness for future workload changes.
Which action best addresses the monitoring issue?

 
 
 
 

QUESTION 117
A packaging manufacturer performs a controlled SAP HANA administration change before a weekend reporting cycle. After the activity, the database starts and SAP HANA cockpit shows normal availability. During validation, the administrator sees that a scheduled administrative check still uses the previous configuration value even though the new value appears in the saved configuration record. The operations supervisor wants to close the change because no current user sessions are failing.
The constraint is that the administrator must confirm that scheduled administration will execute with the approved configuration. The validation must focus on the configuration state used during execution, not only current database availability.
What should the administrator do before closing the change?

 
 
 
 

QUESTION 118
CHALLENGE 4 – Operational Recoverability Evidence Gate
Backups completed for the upgraded reporting system and the newly installed validation database before the review began. Recovery validation for the validation database is scheduled but not complete, and the upgraded system has only backup completion evidence. What should happen before the readiness checkpoint supports operational sign-off?

 
 
 
 

QUESTION 119
A regional university administration team maintains SAP HANA for student services analytics. After a minor configuration update, SAP HANA cockpit shows the database as running, but the scheduled administrative job that confirms configuration status reports “not executed.” The job owner still has access, and the configuration worksheet shows the expected values entered before the update.
The constraint is that the administrator must confirm whether the configured state was actually validated after the change. The operations lead will not accept manual worksheet entries as proof that post-change administration checks were completed.
Which action best resolves the validation gap?

 
 
 
 

QUESTION 120
A regional paper packaging manufacturer is preparing an SAP HANA upgrade validation for an on-premises administration environment. The upgrade task completed, and SAP HANA cockpit shows the database as available. During validation, the administrator finds that the operations note records the new target level, but the lifecycle evidence file still contains the pre-upgrade component reference from the maintenance rehearsal. The plant reporting team asks to release the system because scheduled analytics are running.
The constraint is that the administrator must prove the upgraded lifecycle state before release. The decision cannot depend only on database availability or successful report execution when lifecycle evidence still reflects the earlier state.
Which action best supports release approval?

 
 
 
 

QUESTION 121
A regional cold-chain logistics company uses SAP HANA for shipment temperature analytics. The backup schedule runs successfully, and SAP HANA cockpit shows recent backup entries. During a recovery readiness review, the administrator finds that the validation environment can read the data backup file but cannot access the related catalog metadata needed to select the correct recovery sequence. The operations team suggests restoring directly from the visible data backup because the file itself is available.
The constraint is that the administrator must validate a controlled recovery process, including correct backup selection and recovery sequence evidence. The team cannot approve readiness based only on the presence of a backup file.
Which action best supports recovery readiness validation?

 
 
 
 

QUESTION 122
CHALLENGE 2 – Simulation Monitoring Baseline Control
The team has two possible actions before the second SIT run: tune the database now to improve simulation runtime, or first preserve monitoring evidence and then tune if the evidence supports it. Which action is most defensible?

 
 
 
 

QUESTION 123
An engineering services firm uses an on-premises SAP HANA system for daily operational processing and a separate SAP HANA Cloud database for project analytics. After a controlled stop and start sequence during maintenance, administrators confirm that the main instance is reachable again. However, one scheduled post-maintenance validation still fails because the target database remains inactive for application use even though general service status looks normal.
A colleague proposes restarting the full system one more time to clear any remaining inconsistency. The maintenance coordinator wants the smallest corrective action that restores the required database state without disturbing healthy components that are already back online.
What should the administrator do next?

 
 
 
 

QUESTION 124
CHALLENGE 3 – Cloud Planning Evidence Separation
The leadership update needs to cover current recovery readiness and future SAP HANA Cloud reporting migration. The on-premises readiness systems have backup and monitoring evidence, while the cloud database has provisioning and sample data only. Which action best supports accurate decision-making?

 
 
 
 

QUESTION 125
CHALLENGE 3 – Cloud Migration Readiness Separation
The project team wants to approve cloud migration planning using three facts: the SAP HANA Cloud database is provisioned, limited activation data is loaded, and on-premises UAT reports run successfully. Which validation step is still required?

 
 
 
 

QUESTION 126
A regional home services company uses SAP HANA for technician assignment analytics in an on-premises administration environment. After a controlled start activity, SAP HANA cockpit shows the database as available, and business users can open dashboards. During operational validation, the administrator sees that one administration parameter is active for the system database context but not for the tenant context used by the scheduled reporting workload. The change record lists the parameter as completed.
The constraint is that the administrator must confirm the configuration in the context where execution occurs. The team must not approve the activity based only on a completed change record or system-level visibility.
Which action best resolves the configuration validation gap?

 
 
 
 

QUESTION 127
A pharmaceutical packaging company is validating a planned software maintenance activity on its on-premises SAP HANA database while keeping dependent analytical work active in SAP HANA Cloud. After the maintenance sequence, the system is available, but one lifecycle validation record still shows the pre-maintenance level.
Basic operational checks succeed, so a junior administrator argues that the discrepancy can be ignored until the next window. The maintenance lead is concerned because future administration steps rely on a fully consistent lifecycle state. The team must resolve the issue now without triggering an unnecessary rollback of the entire maintenance cycle.
What is the best next action?

 
 
 
 

QUESTION 128
A regional utilities billing provider uses SAP HANA for meter usage analytics in an on-premises administration environment. After a planned stop and start sequence, SAP HANA cockpit shows the database as available. During post-start validation, the administrator finds that a scheduled health-check job did not run because its execution window still references the pre-maintenance calendar setting. Manual checks succeed, and the support team wants to close the activity because user dashboards are accessible.
The constraint is that the administrator must confirm routine post-start administration is restored before closure. The validation must prove scheduled execution readiness, not only manual access or database availability.
Which action best resolves the post-start validation gap?

 
 
 
 

QUESTION 129
CHALLENGE 4 – Rollout Recovery Validation Gate
Backups completed for the upgraded pilot system and the newly installed SAP HANA wave database before the rollout checkpoint. Recovery validation for the wave database is scheduled but not complete, and the pilot system has only backup completion evidence. What should happen before wave release approval?

 
 
 
 

QUESTION 130
A regional furniture manufacturer uses SAP HANA for production-demand analytics. SAP HANA cockpit shows the database as available, but the operations dashboard displays a short CPU spike during the planning run while the workload log shows a longer query wait interval. Users reported slow report refreshes at the same time. A coordinator suggests raising the CPU alert threshold because the spike was brief.
The constraint is that the administrator must determine whether the user delay is related to workload wait behavior before changing monitoring thresholds. The next planning run must remain observable with evidence that can support troubleshooting.
Which action best supports the troubleshooting decision?

 
 
 
 

QUESTION 131
CHALLENGE 1 – Supplier Allocation Readiness for Shared Material Demand
A plant buyer argues that urgent materials should allow local supplier substitution whenever the expected allocation pattern does not appear quickly enough during rehearsal. The cutover office is concerned that this approach will create unpredictable post-go-live support demands. Which decision is most appropriate?

 
 
 
 

QUESTION 132
A regional scientific instruments company is planning an incremental migration rehearsal from SAP HANA on-premises to SAP HANA Cloud. The source system export completes, and the cloud target is reachable in database explorer. Before import approval, the administrator discovers that the migration worksheet records the target connection test but does not record whether the target administration baseline was captured before loading migrated data. The project lead wants to continue because target access is confirmed.
The constraint is that the rehearsal must preserve a clean before-and-after comparison for the cloud target. The team must be able to distinguish pre-import target readiness from post-import migrated-state validation.

 
 
 
 

QUESTION 133
CHALLENGE 2 – Traceability Workload Monitoring Baseline
The database team can either tune memory-related settings now to improve late-shift traceability reporting or first preserve baseline monitoring evidence and tune only if the evidence supports it. Which option is most defensible?

 
 
 
 

Best updated resource for C_DBADM_2601 Online Practice Exam: https://www.examslabs.com/SAP/SAP-Certification-Exams/best-C_DBADM_2601-exam-dumps.html

         